September 21, 2018, 10:39:30 PM

Summary

romeofarmer615 Newbie

  • geothermal heating and cooling
Offline Offline
Posts:
0 (0 per day)
Karma:
0
Age:
41
Date Registered:
January 27, 2012, 09:00:35 AM
Local Time:
September 21, 2018, 10:39:30 PM
Last Active:
March 13, 2012, 09:12:24 PM
Signature:
Specification of a complete closed loop heat exchanger:  vertical bore, horizontal, or pond.  Construction documents are produced, and stamped, under the supervision by an engineer licensed in the State where the work is performed;
Heat exchanger to supply water temperatures never greater than 90F a